TVA Turns 90

by Staff
0 comment

TENNESSEE VALLEY-Join us in celebrating TVA’s 90th anniversary in 2023! This summer, we’re offering the opportunity to tour several of our monumental dams.

From the White House

For our 90th anniversary, President Biden offered his congratulations to TVA for returning hope, opportunity, and dignity to the region and helping make the Tennessee Valley region the great community it is today.

Celebrate TVA Dams

Built for the PeopleThe Unified Development of the Tennessee River plan stressed TVA was to provide flood control, navigation and electricity for the region. TVA’s dams are tangible evidence of its primary mission: improving life in the Tennessee Valley. We’re celebrating the plan with an in-depth look at 32 of the dams it comprises.

 

historic tour of TVA dam

Dam Tours

This summer, TVA is offering public tours of some of our dams, allowing you to see inner workings of a dam and learn how we produce clean hydropower while ensuring the health of the waterways.

  • Each tour will be limited to 20 people.
  • Tours will be offered twice a day, at 10:00 a.m. and 1:30 p.m. Each tour lasts 60-90 minutes.
  • Since demand is very high, we will use a random drawing to select from the pool of registrants. You will be notified by email indicating whether or not you were selected. Registering does NOT guarantee a space on the tour.
  • Please do not register if you are a current TVA employee.
  • See below for the registration timeframes. A link will be available on this page when registration is open.

Note: Because Raccoon Mountain is undergoing an outage, visitors will not be allowed on the generator floor. You will be able to ride the elevator down into the mountain and view the inside of the facility from the overlook.

REGISTER FOR A DAM TOUR

June Tours

June 2 – Kentucky Dam (Google directions)
June 9 – Kentucky Dam (Google directions)
June 23 – Raccoon Mountain Pumped-Storage Plant (Google directions)

Registration Opens Registration Closes Email Notification
May 8, 2023 May 21, 2023 May 26, 2023

REGISTER FOR A DAM TOUR

July Tours

July 7 – Norris Dam (Google directions)
July 14 – Raccoon Mountain Pumped-Storage Plant (Google directions)
July 21 – Chickamauga Dam (Google directions)
July 28 – Fontana Dam (Google directions)

Registration Opens Registration Closes Email Notification
June 12, 2023 June 25, 2023 June 30, 2023

August & September Tours

August 4 – Wilson Dam (Google directions)
August 11 – Norris Dam (Google directions)
August 18 – Wilson Dam (Google directions)
August 25 – Chickamauga Dam (Google directions)
September 8 – Pickwick Landing Dam (Google directions)

Registration Opens Registration Closes Email Notification
July 10, 2023 July 23, 2023 July 28, 2023

Media Release/TVA

Related Posts

Leave a Reply

[script_13]

This site uses Akismet to reduce spam. Learn how your comment data is processed.